Laserfiche WebLink
■ NewFields <br /> Perspective. Vision SOIu1 WIS <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek& Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date: April 9, 2018 <br /> S M T W T F S <br /> Temperature: Low: 25°F to High:41°F Weather: Overcast <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Ore Excavation <br /> A CAT D9T dozer and a D6T LGP dozer removed ore material between 9750' and 9850' elevations <br /> stockpiling the material near the 9750' bench to placed later. The ore material was cut to 2.5' <br /> above the liner using D6T. The D9T on a minimum 4' of geomembrane cover. <br /> 1.2 Geomembrane Installation: <br /> No activities performed during the shift. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed ore removal. <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended the project pre-shift safety meeting conducted by Ames <br /> Construction. <br />