My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-05_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-07-05_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2021 8:18:55 AM
Creation date
7/6/2018 10:51:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
7/5/2018
Doc Name Note
Subgrade & Geomembrane Evaluations
Doc Name
Construction Quality Assurance Report (CQA)
From
CC&V
To
DRMS
Type & Sequence
TR100
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NewFielion ds <br /> ns <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date:April 6, 2018 <br /> S M T W T F S <br /> Temperature: Low: 33°F to High: 39°F Weather: Overcast with Snow <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Ore Excavation <br /> Ames removed ore material from the area between the 9750' and 9850' benches stockpiling on <br /> the DCF just below the 9750 bench.The ore was pushed downhill using a CAT D6T LGP dozer. <br /> A four-inch CPe pipe was exposed using a mini excavator and laborers. The pipe was cut to <br /> allowing to allow a measuring tape to be placed in the pipe. The measuring tape was pushed <br /> down the slope in the pipe and stopped at 61 feet due to a possible blockage. This indicates the <br /> possibility of DCF movement at that location. <br /> 1.2 Geomembrane Installation: <br /> No activities performed during the shift. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed ore removal and pipe measurement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.