My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-05_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-07-05_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2021 8:18:55 AM
Creation date
7/6/2018 10:51:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
7/5/2018
Doc Name Note
Subgrade & Geomembrane Evaluations
Doc Name
Construction Quality Assurance Report (CQA)
From
CC&V
To
DRMS
Type & Sequence
TR100
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z� LEGEND: <br /> 0 0 0 LIMITS OF GEOMEMBRANE ACCEPTANCE <br /> P1708 PANEL NUMBER <br /> .0% DESTRUCT FUSION NUMBER AND REPAIR <br /> �j MIN DESTRUCT EXTRUSION NUMBER AND REPAIR <br /> PREVIOUSLY CERTIFIED PANEL NUMBER <br /> DESTRUCT FUSION NUMBER AND REPAIR <br /> DESTRUCT EXTRUSION NUMBER AND REPAIR <br /> NOTES: <br /> 1. THE EXISTING GEOMEMBRANE PANEL LAYOUT AND LOCATION <br /> 366pp OF DESTRUCTS AND REPAIRS WAS DEVELOPED BY NEWFIELDS <br /> AS PART OF THE RECORD OF CONSTRUCTION REPORT FOR <br /> THE SQUAW GULCH VALLEY LEACH FACILITY PHASE 1 <br /> COMPLETION, DATED OCTOBER 14, 2016. <br /> 2. THE GEOMEMBRANE PANEL LAYOUT SHOWN AS PART OF <br /> RECORD OF CONSTRUCTION FOR THE VLF2 RECERTIFICATION <br /> BETWEEN THE 9650' AND 9750' BENCH WAS SURVEYED BY <br /> FORSIGHT WEST AND PROVIDED TO NEWFIELDS ON JUNE 21, <br /> 2018 IN A FILE CALLED "MLE2 VLF Liner As—built thru <br /> 6-19-18.dwg". <br /> 3. THE DESTRUCTS AND REPAIRS SHOWN AS PART OF RECORD <br /> OF CONSTRUCTION FOR THE VLF2 RECERTIFICATION BETWEEN <br /> THE 9650' AND 9750' BENCH WAS SURVEYED BY FORSIGHT <br /> WEST AND PROVIDED TO NEWFIELDS ON JUNE 21, 2018 IN A <br /> FILE CALLED "MLE2 VLF Liner Tests thru 6-20-18.dwg". <br /> l� <br /> o Y <br /> i <br /> A. <br /> - o <br /> o <br /> I U <br /> 0 Y \ <br /> I <br /> N <br /> O � <br /> O I <br /> N � <br /> U <br /> � I <br /> 1 1 p �G <br /> Tf _�__; Lit <br /> a' •� �r <br /> a �62p0 . <br /> N E <br /> U <br /> u <br /> c <br /> c <br /> 0 40 80 FEET •• ......... v' <br /> J <br /> U <br /> U APPROVED a DISCWMER CLIENT CRIPPLE CREEK & VICTOR <br /> o JNM NEWFIELDS PRODUCED THE INFORMATION PRESENTED • ewFields GOLD MINING COMPANY <br /> o CHECKED Br: ON THIS DRAWING THROUGH THE USE OF AVAILABLE PROJECT <br /> JNM ETECHNICAL INFORMATION AND CEMNG THIS DRAWING DOES NOT GUARANTEEANY VLF2 RECERTIFICATION <br /> DESIGNED SY: RIGHTS TO EITHER SUCH TECHNICAL INFORMATION OR <br /> °' JNM EXPERIENCE. ANY MODIFICATION OR ADAPTATION OF TITLE FLENMAE <br /> a 0 �/a/T8 ISSUED FOR RECORD OF CONSTRUCTION REPORT JNM JNM THE DATA OR DRAWING SHALL BE AT USER'S RISK GEOMEMBRANE PANEL LAYOUT AS—BUILT 106.023.005E <br /> DRAWN BY: AND WITHOUT ANY LIABILITY OR LEGAL BETWEEN 9650' AND 9750' BENCH DRAWING"0. 1 REVISION <br /> a/' F1:'1F DATE DESCRIPTION TECH ENG JNM RESPONSIBILITY TO NEWFIELDS. 'z 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.