Newmont Mining Corporation <br /> Record of Construction Report ■ <br /> VLF2 Recertification Project <br /> Subgrade and Geomembrane 9650'—9750'Elevations <br /> NewFields Project No.475.0106.026 <br /> July 3,2018 <br /> 5.1.1. Third Party Conformance Testing <br /> 5.1.1.1. Manufactured Geomembrane <br /> Third party conformance test samples were obtained at a rate of one test for every 38,722 square <br /> feet and two for the one resin lot used. The specifications require at least one test sample for <br /> every 150,000 square feet and at least one test for each resin lot. Samples were tested by TRI in <br /> Anaheim,CA.All conformance test results were reviewed by a NewFields representative and met <br /> the technical specifications.Third party conformance test results are presented in Appendix F.1. <br /> 5.1.1.2. Existing Geomembrane <br /> The existing geomembrane that was exposed and tied into was also tested and met requirements <br /> of Technical Specifications for conformance test samples.The existing geomembrane test sample <br /> locations are shown on Drawings 3 and testing results are presented in Appendix F.2. <br /> 5.1.2. Geomembrane Panel Deployment <br /> The SLF surface was inspected by the CQA monitor prior to geomembrane deployment, ensuring <br /> the surface was free of any protruding rock greater than 0.75" or irregularities (rutting, ridges, <br /> indentations, etc.) greater than 0.5". The SLF surface was approved by Comanco, Ames, CC&V, <br /> and NewFields prior to and during deployment each day. SLF acceptance forms are presented in <br /> Appendix C. During geomembrane panel deployment the CQA Monitor logged the dimensions of <br /> each panel,the roll number used for each panel, and measured the thickness of the panel edges. <br /> Roll numbers were checked against the site inventory to ensure only approved geomembrane <br /> was deployed.The Geomembrane Panel Deployment Summary is presented in Appendix E.I. <br /> 5.1.3. Geomembrane Fusion Seaming <br /> Double-wedge fusion welding was the primary method of geomembrane seaming for the VLF2 <br /> Recertification for subgrade and geomembrane between the 9650' and 9750'. Prior to fusion <br /> welding activities, trial welds were performed for each welding machine and welding technician <br /> combination. The fusion welding trial seam logs are presented in Appendix E.2. The weld was <br /> inspected constantly for insufficient overlap, burnouts, or any other damage caused during the <br /> welding process. The CQA Monitor logged the welding machine and welding technician <br /> combination, the length of the seam, the direction the seam was welded, time of seaming, the <br /> welding machine temperature, and the welding machine speed. Destructive test samples were <br /> marked during fusion seaming and testing is discussed further in Section 5.1.5. Continuity <br /> conformance of the seam is also performed using pressure tested methods and is discussed <br /> further in Section 5.1.6. The Geomembrane Fusion Welding Summary is presented in Appendix <br /> E.4. <br /> Page 9 <br />