My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-05_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-07-05_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2021 8:18:55 AM
Creation date
7/6/2018 10:51:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
7/5/2018
Doc Name Note
Subgrade & Geomembrane Evaluations
Doc Name
Construction Quality Assurance Report (CQA)
From
CC&V
To
DRMS
Type & Sequence
TR100
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation <br /> Record of Construction Report ■ <br /> VLF2 Recertification Project <br /> Subgrade and Geomembrane 9650'—9750'Elevations <br /> NewFields Project No.475.0106.026 <br /> July 3,2018 <br /> geomembrane installation activities. Geomembrane quality assurance observations and testing <br /> is discussed further in Section 5. <br /> 3.6. Anchor Trench <br /> The geomembrane was temporarily anchored on the bench at the 9750' elevation in a minimum <br /> 2-foot-wide and 2-foot-deep anchor trench. Once non-destructive testing and repairs were <br /> completed and approved, the anchor trench was backfilled by Ames in accordance with the <br /> Technical Specifications.The backfill material was placed in 12-inch-thick lifts and compacted by <br /> a vibratory plate compactor, "Jumping Jack" compactor, or a smooth drum vibratory compactor. <br /> In areas where future geomembrane installation would cover the anchor trench,SLF was used to <br /> backfill the top 12 inches of the anchor trench. <br /> 4. GEOMEMBRANE QUALITY CONTROL SUBMITTALS <br /> The CQA Monitor reviewed and approved all geomembrane QC submittals, including <br /> geomembrane installation personnel resumes,geomembrane roll QC certificates,geomembrane <br /> resin QC certificates,and welding rod QC certificates.The CQA Monitor tracked all geomembrane <br /> delivered to site in the site inventory. The site inventory for all geomembrane used within the <br /> VLF2 Recertification area are presented in Appendix D.I. <br /> 4.1. Geomembrane Installation Personnel Resumes <br /> Comanco submitted the resumes of all installation personnel prior to construction or repair <br /> activities within the VLF2 Recertification Project. The CQA Monitor verified that the Installation <br /> Superintendent, Master Seamer and QC Inspector possessed the installation experience required <br /> by the project technical specifications. Geomembrane installation personnel resumes for all <br /> crews that performed work on the VLF2 Recertification Project are presented in Appendix D.2. <br /> 4.2. Geomembrane Roll QC Certificates <br /> The geomembrane for the VLF2 Recertification project was manufactured by AGRU America. <br /> Manufacturing Roll QC certificates were submitted for every roll of geomembrane <br /> (approximately one every 9,000 square feet), exceeding the required minimum frequency of one <br /> per 50,000 square feet of geomembrane. The roll QC certificates were reviewed the CQA <br /> Monitor, ensuring all geomembrane materials met or exceeded the project technical <br /> specifications. The roll QC certificates for all geomembrane used within the VLF2 Recertification <br /> area are presented in Appendix D.3. <br /> Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.