My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-22_REVISION - M1987103
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987103
>
2018-06-22_REVISION - M1987103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:28:47 PM
Creation date
7/5/2018 12:00:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987103
IBM Index Class Name
REVISION
Doc Date
6/22/2018
Doc Name
Adequacy Review Response #2
From
Kilgore/Elam
To
DRMS
Type & Sequence
SO4
Email Name
THM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. All sale material is to be removed by end of contract and the disturbed pit area re- <br /> contoured/reseeded within 6 months of contract termination. <br /> 9. Fall seeding must be completed after September 1,and prior to prolonged ground frost. <br /> 10. Following seed mix implement for reclamation: <br /> Species PLS/acre <br /> Western Wheatgrass Arriba 3 <br /> Thickspike Wheatgrass Critana 2 <br /> Streambank Wheatgrass Sodar 2 <br /> Fourwing saltbrush Wytana/Rincon 2 <br /> Prepare seedbed by disking or ripping following the natural contour.Drill seed on contour at <br /> a depth no greater than 1/2 inch. In areas that cannot be drilled, broadcast at double the <br /> seeding rate and harrow seed into soil.Certified seed is recommended. <br /> 11.The White River Resource Field Manager will be notified at least 24 hours prior to <br /> commencing reclamation work. <br /> 12. Annual or noxious weeds will be controlled on all disturbed areas as directed by the White <br /> River Resource Area Manager.Method of control shall be by an approved mechanical <br /> method or an Environmental Protection Agency(EPA)registered herbicide.All herbicide <br /> application proposals must be approved by the BLM.Application of herbicides must be <br /> under direct field supervision of an EPA certified pesticide applicator. <br /> 13. Keep road inlet and outlet ditches,catch-basins, and culverts free of obstructions,particularly <br /> before and during spring runoff.Routine machine-cleaning of ditches should be kept to a <br /> minimum during wet weather.Leave the disturbed area in a condition that provides drainage <br /> with no additional maintenance. <br /> 14. The operator is responsible for obtaining all applicable permits from the state or local <br /> governments_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.