My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-03_PERMIT FILE - M2018016 (10)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018016
>
2018-07-03_PERMIT FILE - M2018016 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2021 5:08:23 AM
Creation date
7/3/2018 12:00:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018016
IBM Index Class Name
PERMIT FILE
Doc Date
7/3/2018
Doc Name
Objection
From
John Massey
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R��E�VEp <br /> 6/29/2018 <br /> To Colorado State Agencies and Clear Creek County Agencies: JUG p 3 2018 <br /> 01V!8"OF <br /> Subject: Permit#M2018016 Douglas Mountain Mine Project * C�i� <br /> VDSOFp+, <br /> My name is John P. Massey. I am part of a group of concerned citizens who are in opposition to the development of a strip mining <br /> operation in our county. I would like to share my concerns and objections regarding the proposed development of the Douglas <br /> Mountain Mining Operation in Clear Creek County which would be located at or near Section 28,Township 3S, Range74W, 6`h <br /> Principle Meridian in Clear Creek County: namely Empire Junction and westward to the town of Empire. <br /> Water Issues: <br /> Here are just a few of the detrimental effects of this 150 acre, 200 feet deep gravel pit operation. This proposed operation will <br /> damage/deplete the local water systems of Bard Creek, Mad Creek and Clear Creek.The water table on the plateau is also very <br /> shallow thereby contaminating ground water and natural springs. The amount of water needed to run this type of operation would <br /> be astronomical. We are constantly in the midst of a drought here in Colorado and the foreseeable future looks no better.As <br /> populations in the area continue to grow the increased demand for water in Clear Creek County and onward to the Front Range will <br /> only increase. Allocating millions of gallons yearly for a strip mining operation is inappropriate and wasteful. <br /> Wildlife Issues: <br /> Wildlife in the area would be extremely affected. Land erosion would be significant potentially contaminating Clear Creek with toxic <br /> soil and chemicals thereby disturbing/destroying the fish habitat which includes the endangered Greenback cutthroat that have <br /> been reintroduced to this area. The wildlife that lives on/near the plateau would be devastated and potentially destroyed. Elk, <br /> deer, moose and bear roam this plateau. Also thriving in this area is a substantial Big Horn Sheep population whose range and <br /> migratory patterns are well documented in the recent Colorado Parks and Wildlife report entitled "Population Estimation,Survival <br /> Estimation and Range Delineation for the Georgetown Bighorn Sheep herd" dated Sept. 2015. This is the largest Big Horn Sheep <br /> population in the nation, not to mention our State animal. Do you really want to jeopardize their existence by allowing the <br /> development of a mining operation in the midst of their habitat? <br /> Air Pollution Issues: <br /> The air pollution due to the massive amount of dust entering the environment through the strip mining operation and the hundreds <br /> of trucks daily transporting materials would cause health issues for many residents. In particular, the Easter Seals Rocky <br /> Mountain Village Camp is directly across the highway from this potential strip mining operation. The dust and other pollutants will <br /> negatively affect the 1200+campers with special needs that attend this camp to enjoy the Rocky Mountains and the clean fresh air. <br /> Many of these individuals deal with respiratory issues. Is jeopardizing the health and wellbeing of this sensitive population and the <br /> potential closing of this Easter Seals Rocky Mountain Village camp that was established in 1951 worth the risk? <br /> The Douglas Mountain Mine development would destroy the only plateau in Clear Creek County! Our State and County is in need of <br /> a positive, echo friendly,tourism friendly and wildlife friendly use for this land. Please, I am asking you to deny the establishment of <br /> the Douglas Mountain Mine. <br /> Best Regards, <br /> Jo�nP. assey <br /> jmassey@masseywehr.com <br /> Cc: Department of Reclamation Mining and Safety, Colorado Parks and Wildlife, Board of supervisors—Soil and Conservation <br /> District, State Board of Land Commissioners, U.S.Army Core of Engineers,Colorado Department of Health and Environment, Division <br /> of Water Resources,Air Pollution Control Division, Clear Creek County Planning Commission,Clear Creek County Commissioners <br />
The URL can be used to link to this page
Your browser does not support the video tag.