Laserfiche WebLink
EXHIBIT G <br /> Water Information <br /> This operation is not expected to affect surface or groundwater systems. <br /> Water use will be minimal and only for nuisance dust control. Water will be <br /> purchased from Dolores Water Conservancy District and trucked from the canal in <br /> Dove Creek as is standard operating procedure for Dolores County Road <br /> Department. It is estimated that at times of the year when the weather is dry the <br /> mining operation may require one truckload (4000 gal) per day. No groundwater <br /> is anticipated at this site and no existing water rights will be affected. Points of <br /> storm water run-in and run-off will remain unchanged, as will the amount of run- <br /> off. However, the water course through the site may be altered as site is mined <br /> to prevent water from entering the excavation. <br />