Laserfiche WebLink
Rocky Mountain Resources <br /> ROCKY MOUNTAIN 4601 DTC Blvd. Suite 120 <br /> R E S O U R C E S Denver,CO 80237 <br /> Post Drilling As-Built Drawing: <br /> Within 30 days of the completion of the exploratory drilling, RMR will submit a final report, an as-built <br /> drawing, and a data sheet showing the location and dimensions of all holes drilled. <br /> The final report and as-built drawings will contain the following information: date of completion, hole <br /> diameter, total depth drilled, GPS surface location, drilling pad, hole inclination, presence of water, <br /> whether the water was static or artesian,flow rate if artesian, and whether the hole will be used for <br /> geotechnical analysis. <br /> The final report will also contain an abandonment report for the plugged holes.The abandonment <br /> report will include: date of abandonment, depth of non-metallic plug placement, intervals of various <br /> plug material types, and placement depths. If a wet hole is plugged, the abandonment report will also <br /> contain the interval(s) at which the bentonite or cement plug was used, and the volume of bentonite or <br /> cement used. <br /> Rock Testing: <br /> RMR plans to perform several tests on the rock samples including: <br /> • UCS testing on core samples <br /> • XRF testing on core and chip samples <br /> • Rock properties testing on crushed core samples <br /> RMR will submit the findings of any testing to the CO DRMS for their records. <br /> Should there be any questions regarding our request, please contact Bobby Wagner at <br /> rwagner@rmrholdings.com. We appreciate your consideration of our request, and we look forward to <br /> hearing from you soon. <br /> Sincerely, <br /> (A) <br /> Robert T.Wagner <br /> VP, Colorado Operations <br /> Rocky Mountain Resources <br /> 720-660-3279 <br /> rwagner@rmrholdings.com <br /> 4 <br />