EXHIBIT L WORST CASE RECLAMATION SCENARIO <br /> The maximum worst case disturbance at any time will be 16.5 acres. Given the length of time it <br /> will take to mine this entire site (>12 years), the operator will not phase the operation and the <br /> bond. The current bond is $171.100.00. <br /> The following reclamation tasks will be required. <br /> • Mobilization of equipment<45 miles= $6.000.00. <br /> • Active highwall area backfilling= 0.5H:1 V to 31-1:1 V slope; area 2,875 ft' multiplied by <br /> the 300 ft highwall length, at 27 CF/CY = 31.944 CY at $1.50/CY = $47,916.67. <br /> • Topsoiling of the active mining face and pit floor— 16.5 acres at 8 inches deep= 17.569 <br /> CY at $1.50/CY = $26,353.50. <br /> • Irrigated pastureland revegetation of the remaining 16.5 acres disturbed area. 16.5 acres <br /> at $850/acre = $14,025.00. <br /> Table L-1 Expansion Reclamation Task and Cost Estimate <br /> Activity Description Time(Months) Cost($) <br /> Mobilization<45 mile 1 6,000.00 <br /> Active highwall backfilling 3 47,916.67 <br /> Topsoiling of all disturbed areas 2 26,353.50 <br /> Revegetation of disturbed areas. Includes seeding and mulching. 1 14,025.00 <br /> Subtotal 7 $94,295.17 <br /> DRMS Costs(28%x direct costs) $26,402.65 <br /> Final Reclamation Bond Amount $120,697.82 <br /> This is less than the currently posted bond, and therefore no additional bond is needed. <br /> Fetcher Vale Pit <br /> Nlav 2018 L-1 <br />