Laserfiche WebLink
<br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />N - Air Resource Protection <br />R - Availability of Records <br />N - Backfill & Grading <br />N - Excess Spoil and Dev. Waste <br />N - Explosives <br />N - Fish & Wildlife <br />R - Hydrologic Balance <br />N - Gen. Compliance With Mine Plan <br />N - Other <br />N - Processing Waste <br /> <br />R - Roads <br />N - Reclamation Success <br />R - Revegetation <br />N - Subsidence <br />R - Slides and Other Damage <br />N - Support Facilities On-site <br />N - Signs and Markers <br />N - Support Facilities Not On-site <br />N - Special Categories Of Mining <br />N - Topsoil <br /> <br /> <br />COMMENTS <br /> <br />This was a complete inspection of the GEC Mine conducted by Zach Trujillo of Colorado Division of <br />Reclamation, Mining and Safety (DRMS) on June 14, 2018. The GEC Mine was a surface mine which the <br />Division has revoked the bond and terminated the permit. Therefore, no mine operator remains. All bond monies <br />available to the Division were utilized by the Divisin for reclamation activitries and no reclamation bond money <br />remains to conduct maintenance activities. The weather was clear and ground conditions were dry. Temperatures <br />during the inspection were around eighty five degrees fahrenheit. <br />AVAILABILIT Y OF RECORDS – Rule 5.02.4(1): <br />This is a bond forfeiture site and all applicable records are maintained by the Division. <br /> <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br />Drainage – Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9 ; Stream Buffer Zones 4.05.18: <br /> <br />The channel located along the access road north of the East Area has multip le concrete check structures. The check <br />structures have been undercut and rendered useless . The channel itself is heavily cut. <br /> <br />The separating channel between the East and West Areas was inspected and remains stable. Erosion and some <br />cutting were observed. <br /> <br />ROADS – Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3), Drainage 4.03.1(4)/4.03.2(4), Surfacing and Maintenance4.03.1(5) and <br />(6)/4.03.2(5) and (6), Reclamation 4.03.1(7)/4.03.2(7): <br />The access road leading the east area has erosion along some of the steep er sections. Due to the lack of use, <br />vegetation has begun to establish itself within the road. Drainage crossings through the road remain stable with no <br />erosion across . <br /> <br />REVEGETATION – Rule 4.15 <br />Vegetative Cover; Timing: