My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-26_PERMIT FILE - M1977141
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1977141
>
2018-06-26_PERMIT FILE - M1977141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2021 6:22:02 AM
Creation date
6/26/2018 11:30:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977141
IBM Index Class Name
PERMIT FILE
Doc Date
6/26/2018
Doc Name Note
Notice of Material Imported for Backfill
Doc Name
Comment
From
Aggregate Industries
To
DRMS
Email Name
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Aggregate will prepare and submit an Inert Fill Notice and the Inert Materials Profile and <br /> Affidavit provided by Boulder County to DRMS as required under Aggregate's Permit. <br /> 5. Boulder County will be responsible for any other required permits associated with the <br /> imported fill and fill placement. <br /> 6. Aggregate will provide to Boulder County design specifications,grading plan and earthwork <br /> specifications associated with the EWP fill and placement area set forth in Figure 1. <br /> 7. Boulder County will be responsible for and pay the costs of all labor,equipment and <br /> materials required to place the imported materials in an engineered,quality controlled,and <br /> stable embankment fill as set forth below: <br /> a. Fill materials,placement methods,and placement geometry must not impact the fill <br /> placement,stability,or performance of the Permit approved reclamation plan slopes. <br /> b. Fill Placement. The final in place fill shall meet the reclamation plan specifications <br /> regarding material type,gradation,moisture content,compaction,horizontal lift <br /> placement,and maximum lift thickness as follows: <br /> i. Material Type—ASTM Classifications of SW,SP,SC,SM,SC-SM,GW, <br /> GP,GC,GM,and GC-GM. <br /> ii. Gradation—Graded uniformly and continuously from boulder size to silt <br /> size, maximum particle size equal to two-thirds of the lift thickness, <br /> maximum 45 percent fines in the minus 3-inch fraction. <br /> iii. Moisture Content—Within 3 percent of optimum based on ASTM D698. <br /> iv. Minimum Compaction—Greater than 90 percent of the maximum dry <br /> density based on ASTM D698. <br /> v. Fill should be placed in horizontal lifts not to exceed 2 feet thick. <br /> Compaction requirements depend on the lift thickness and the compaction <br /> equipment used for compaction.Adequate compaction should be achievable <br /> by tracking with a dozer or the routing of construction equipment traffic, <br /> provided material characteristics,moisture content and lift thickness are <br /> appropriate. <br /> c. Boulder County will perform and document Quality Assurance/Quality Control <br /> (QA/QC)associated with its placement of the fill adjacent to existing pit walls and <br /> fills slopes,and provide copies of such documentation to Aggregate. <br /> d. Fill Slope Geometry. The final in place fill slopes,bench heights,and overall heights <br /> should be limited as follows: <br /> i. Bench Slope Angle 26.6 degrees or 2H:1 V <br /> ii. Maximum Bench Height 50 feet <br /> iii. Minimum Bench Width 15 feet <br /> iv. Maximum Overall Slope Height 150 feet <br /> 8. Boulder County shall require all of its employees,agents,contractors and subcontractors to <br /> provide all necessary and proper safety supervision of individuals who enter the Premises and <br /> act upon Boulder County's behalf,and Aggregate shall not be responsible for the safety of <br /> any such individuals. <br /> 9. City and its employees,agents,contractors and subcontractors shall comply with all <br /> necessary MSHA and/or OSHA safety training and documentary requirements as determined <br /> by Aggregate, including,but not limited to: <br /> a. Training i.e.task specific,CPR/First Aid <br /> b. Lone Workers <br />
The URL can be used to link to this page
Your browser does not support the video tag.