My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-22_REVISION - M2008017
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008017
>
2018-06-22_REVISION - M2008017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:35:27 PM
Creation date
6/25/2018 8:32:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008017
IBM Index Class Name
REVISION
Doc Date
6/22/2018
Doc Name Note
Adequacy Review Response #2
Doc Name
Adequacy Review Response #2
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following recommendations for monitoring of slope stability should be followed: <br /> 1. A visual inspection of the excavated slopes should be done on a weekly basis for <br /> the first 6 months of mining. This inspection should consist of walking the existing <br /> ground and looking for any signs of stress cracks or other potential signs of slope <br /> failure. Some minor sloughing of slopes is expected on any mine site. The intent <br /> of this inspection is to locate potential major slope failures that could potentially <br /> extend back into a structure. <br /> 2. A visual inspection should be done after a major precipitation event that has <br /> saturated the ground using the same procedures. A major precipitation event <br /> would be defined as a storm that produces an intensity level reached once in 50 <br /> years on the average. <br /> 3. If a visual inspection detects signs of a potential slope failure, qualified personnel <br /> should be contacted to evaluate and recommend remediation work to stabilize <br /> the area. <br /> 4. If no visible signs of slope failure are detected within the first 6 months, then the <br /> inspection period could be reduced to once per month or after every major <br /> precipitation event. <br /> 11111 Broken Arrow Investments,LLC-Derr Pit Project <br /> J&T Consulting, Inc. Slope Stability Analysis <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.