Laserfiche WebLink
0 <br />Trapper Mining Inc. <br />Second Quarter 2018 <br />Impoundment Inspection - Pond Capacity Data <br />Pond ID <br />Princ. Spillway <br />Stage (ft) <br />Total Capacity <br />to PS stage <br />(acre-feet) <br />60% Sediment <br />Capacity <br />(acre-feet) <br />60% Sediment <br />Capacity Stage <br />(ft) <br />Remaining <br />Design Capacity <br />(acre-feet) <br />Inspection <br />Observation <br />(% sediment) <br />Qtr. 2 Estimated <br />Sediment <br />(acre-feet) <br />Qtr. 2 Approximate <br />Rem. Capacity <br />(acre-feet) <br />West Flume <br />10.0 <br />2.35 <br />1.41 <br />7.8 <br />0.94 <br />0.00 <br />0.00 <br />2.35 <br />Middle Flume #1 <br />11.7 <br />0.80 <br />0.48 <br />9.0 <br />0.32 <br />15.00 <br />0.12 <br />0.68 <br />Middle Flume # 3 <br />14.0 <br />3.36 <br />2.02 <br />10.5 <br />1.34 <br />0.00 <br />0.00 <br />3.36 <br />East Middle Flume <br />13.0 <br />2.56 <br />1.54 <br />9.2 <br />1.02 <br />0.00 <br />0.00 <br />2.56 <br />East Flume <br />11.3 <br />1.18 <br />0.71 <br />8.5 <br />0.47 <br />15.00 <br />0.18 <br />1.00 <br />Ute <br />7.0 <br />1.72 <br />1.03 <br />5.2 <br />0.69 <br />45.00 <br />0.77 <br />0.95 <br />Horse <br />13.3 <br />6.20 <br />3.72 <br />10.3 <br />2.48 <br />60.00 <br />3.72 <br />2.48 <br />West Horse <br />13.0 <br />2.00 <br />1.20 <br />9.7 <br />0.80 <br />20.00 <br />0.40 <br />1.60 <br />Deal <br />16.8 <br />2.00 <br />1.20 <br />15.1 <br />0.80 <br />55.00 <br />1.10 <br />0.90 <br />Impoundment H <br />9.5 <br />4.82 <br />2.89 <br />4.9 <br />1.93 <br />15.00 <br />0.72 <br />4.10 <br />