My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-13_GENERAL DOCUMENTS - C1981038 (3)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981038
>
2018-06-13_GENERAL DOCUMENTS - C1981038 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2023 8:58:14 AM
Creation date
6/25/2018 6:35:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
General Documents
Doc Date
6/13/2018
Doc Name Note
Mining Permit (April 20. 2018 to April 20, 2023)
Doc Name
Permit Document
From
Bowie Resources, LLC
To
DRMS
Permit Index Doc Type
Permit Legal Document
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-5- <br />B. The term of this permit will expire on April 20, 2023. <br />' 'E l i� S ire(i ilf�l-C, i } i'_c"e tC11C`,Ni,i Cx'zCliiiJs,_ti �iitl ,3, 1; cti --c — <br />t.S j�c[�i1.lt h <br />Operator agrees to be bound by all rc-�quirem( nts of the Colorado Surface <br />Coal Mining Reclamation Act (C.R.S. 34-33-101 et seq.) ("the Act"), all lawful <br />rules and regulations thereunder, as amended from time to time, and all provisions <br />of this permit. <br />2. Permittee shall take all possible steps to minimize any adverse impact to the <br />environment or public health and safety resulting from noncompliance with any <br />term or condition of the permit, including, but not limited to: <br />a. Any accelerated or additional monitoring necessary to determine the nature <br />and extent of noncompliance and the results of the noncompliance; <br />b. Immediate implementation of measures necessary to comply; and <br />C. Warning as soon as possible after learning of such noncompliance, any <br />person whose health and safety is in imminent danger due to the <br />noncompliance. <br />3. The permittee shall dispose of solids, sludge, filter backwash, or pollutants removed <br />in the course of treatment or control of waters or emissions to the air in the manner <br />required by Rule 4 and which prevents violation of any other applicable State or <br />Federal law. <br />4. The permittee shall conduct its operations: <br />a. In accordance with any measures specified in the permit as necessary to <br />prevent significant environmental harm to the health or safety of the public; <br />and, <br />b. Utilizing any methods specified in the permit by the Division in approving <br />alternative methods of compliance with the Act and in accordance with the <br />provisions of 2.07.6(2)(m) and Rule 4. <br />5. The operator shall pay all reclamation fees required by 30 CFR, Chapter VII, <br />Subchapter R(1989), for coal produced under the permit for sale, transfer or use, in <br />the manner required by that Subchapter. <br />6. Within thirty days after a cessation order is issued under 5.03.2(1), for operations <br />conducted under the permit, except where a stay of the cessation order is granted <br />and remains in effect, the permittee shall either submit to the Division the following <br />information, current to the date the cessation order was issued, or notify the <br />
The URL can be used to link to this page
Your browser does not support the video tag.