Laserfiche WebLink
June 11, 2018 C-1981-025/North Thompson Creek Mine JHB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 0 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 5 of 6 <br /> <br /> <br />Photo 7: Trampled channel between T-1 and T-2 Photo 8: Water clarity in T-2 <br /> <br />Photo 9: piping system in T-2 to ditch to refuse pond Photo 10: ditch carrying water to refuse pond <br /> <br />Photo 11: Refuse pond Photo 12: North Thompson Creek looking eastward <br /> From bridge. <br /> <br />