My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-28_REVISION - M1987103
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987103
>
2018-02-28_REVISION - M1987103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:28:46 PM
Creation date
6/21/2018 1:00:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987103
IBM Index Class Name
Revision
Doc Date
2/28/2018
Doc Name
Request For Succession Of Operator
From
DRMS
To
Russell Larsen
Type & Sequence
SO4
Email Name
THM
BJC
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Other Reclamation Permits held by Prospective Successor if applicable). A) 11116d(f-1 <br /> M1978357, M2010016, M1981243, k4"" VAIM <br /> M 1980085, M 1991079, M2002119, M2009078, <br /> UA*A2000030, M1999025,P M 1980080RkM 1979089, M 19999076, M 1998�1005, M1987064, <br /> M 1987 044, M 1986165 M 191W66, M 1996034, M2009048, M 1980131 <br /> DESIGNATION OF REVIEW TIMELINE <br /> As explained above,the Permittee and Prospective Successor may waive their right to receive a <br /> decision on an Application within 30 days in order to allow the Division to calculate the required <br /> Financial Warranty before issuing its decision. Permittee and Prospective Successor must initial <br /> one of the following two options to designate their choice. If Permittee and Prospective <br /> Successor cannot agree, the Division will render its decision within 30 days. <br /> I have reviewed the information provided in this Application <br /> Permittee Packet, as well as the applicable Act and Rules. Having been fully <br /> informed, I wish to WAIVE MY RIGHT TO A DECISION ON <br /> Prospective Successor MY APPLICATION WITHIN 30 DAYS. <br /> I have reviewed the information provided in this Application <br /> Permitte Packet, as well as the applicable Act and Rules. Having been fully <br /> informed, I wish to MAINTAIN MY RIGHT TO A DECISION <br /> Prospective Successor ON MY APPLICATION WITHIN 30 DAYS. <br /> The Prospective Successor must provide an adequate Financial Warranty or conditional <br /> replacement Financial Warranty, consistent with the designation above. Hard Rock and <br /> Construction Materials Rule 4.3 describes the various acceptable types of Financial Warranties. <br /> Each Financial Warranty must be submitted on the Board's approved forms (available online at <br /> http://minin,q.state.co..us/Mineral%20Forms.htm). <br /> - 6 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.