My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-31_ENFORCEMENT - M2017036
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M2017036
>
2018-05-31_ENFORCEMENT - M2017036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2018 12:13:01 PM
Creation date
6/21/2018 10:52:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017036
IBM Index Class Name
Enforcement
Doc Date
5/31/2018
Doc Name Note
Board (MLRB) Order
Doc Name
Board (MLRB) Order
From
DRMS
To
Loveland Ready Mix Concrete, Inc.
Email Name
JLE
MAC
GRM
CMM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
66. Under the Act, the Division and the Board shall grant a permit to an <br />applicant who complies with section 34-32.5-115(4), C.R.S. The Application <br />complies with section 34-32-115(4), C.R.S. <br />ORDER <br />Based on the foregoing findings of fact and conclusions of law, the Board <br />hereby approves the Application, over objections, with the following conditions: <br />a. No less than sixty days prior to exposing groundwater and/or initiating <br />dewatering operations, Applicant shall submit to the Division the <br />results of the baseline water quality monitoring. The results shall <br />include an analysis of the water quality and a discussion of any <br />exceedances of the table value standards for the analytes evaluated <br />within the approved water monitoring plan. <br />b. When the Operator has completed mining in each phase, they shall <br />submit to the Division an as -built or record of drawing(s) certified by a <br />professional engineer registered in the State of Colorado of the clay <br />liner and perimeter drain for each phase of the operation (Phases 1 <br />through 5). The registered professional engineer certification must <br />demonstrate the liner and drain were installed to the required <br />specifications. The registered professional engineer certified as -built <br />or record drawing(s) shall be submitted to the Division not less than <br />sixty days prior to initiating mining in the next or subsequent phase. <br />DONE AND ORDERED this }rte day of May 2018. <br />FOR THE COLORADO MINED LAND <br />RECLAMATION BOARD <br />Z/kz' <br />Forrest Luke, Chair <br />NOTICE OF JUDICIAL REVIEW RIGHTS <br />This order becomes effective and final upon mailing. Any party adversely <br />affected or aggrieved by agency action may commence an action for judicial review <br />by filing a complaint with the district court within thirty-five (35) days after the <br />Loveland Ready Mix Concrete, Inc. <br />Knox Pit/M-2017-036 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.