Laserfiche WebLink
June 14, 2018 C-1982-056/Foidel Creek Mine TNL <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 3 of 8 <br /> <br />Fish Creek Tipple <br />pond <br />Y Y Patchy weed, operator stated <br />weeds were spayed 3 wks prior. <br />Cattails to be cleared from weep <br />holes and grass above weir. <br />Fish Creek Borehole Y N mine water (flock <br />added) <br />Fish creek 3 cell pond , discharge at site 115 <br />triggers sampling at Fish creek <br />downstream. <br />Iron staining on rocks in outfall <br />18LT vent shaft <br />ponds <br />N N <br />Pond F Y N runoff from <br />facilities <br />Foidel <br />Pond G Y N Surface Runoff <br />from laydown <br />Area <br />Foidel <br />Pond E Y N Delta forming @inlet <br />Area No. 1 Pond <br />(Pit Pond) <br />Y Y mine, sumps, <br />diversion dich <br />Pond D <br />Pond D Y Y <br />Pond B Y Y Bob pile Foidel Garbage in 2nd cell, erosional <br />feature above inlet needs to be <br />stabilized, cattail cleared from weir <br />Pond C N N <br />Pond T N N laydown area Foidel v-notch weir, culvert under railway <br />always trickling. White top on TS <br />pile has been sprayed <br />Water Treatment <br />ponds <br />Y Y (to <br />leach <br />field) <br />facilities water leach <br />field <br /> <br /> <br />Stream buffer zone <br />@ train load-out <br /> signs have been placed east of the <br />barrels to show extent of buffer <br />zone more clearly <br />