Laserfiche WebLink
Cotter Corporation Schwartzwalder Mine <br /> <br />RML CO-369-06 <br />Cotter Corporation (N.S.L.) ii March 2017 <br /> <br /> <br />5.0 FINAL STATUS RADIATION SURVEY .......................................................... 22 <br />5.1 FINAL STATUS SURVEYS OF STRUCTURES/EQUIPMENT ........................................ 22 <br />5.2 FINAL STATUS SOIL SURVEYS ............................................................................. 22 <br />5.3 FINAL STATUS SURVEY REPORT .......................................................................... 23 <br />6.0 RADIATION SAFETY ....................................................................................... 24 <br />6.1 GENERAL SAFETY/HAZARD COMMUNICATION .................................................... 24 <br />6.2 PERSONNEL PROTECTION REQUIREMENTS ........................................................... 24 <br />6.3 OCCUPATIONAL MONITORING REQUIREMENTS .................................................... 25 <br />6.4 ENVIRONMENTAL MONITORING REQUIREMENTS ................................................. 25 <br />6.5 ADMINISTRATIVE ACTION LEVELS FOR RADIATION PROTECTION ......................... 26 <br />6.6 DUST CONTROL .................................................................................................. 26 <br />6.8 TRAINING ........................................................................................................... 27 <br />6.9 EMERGENCY RESPONSE ...................................................................................... 27 <br />6.10 RUNOFF CONTROL .......................................................................................... 27 <br />6.11 WIND ............................................................................................................. 27 <br />7.0 SCHEDULE ......................................................................................................... 28 <br />8.0 REFERENCES .................................................................................................... 29 <br /> <br />LIST OF TABLES <br /> <br />Table 1: RML #1 Post-excavation, pre-backfill/grading Soil Sampling Results................ 5 <br />Table 2: Scoping Survey Soil Sampling Results ............................................................ 11 <br />Table 3: Release criteria for buildings and equipment (NRC, 1993) ............................... 12 <br /> <br /> <br />LIST OF FIGURES <br /> <br />Figure 1 – Site Location Map <br />Figure 2 – Site Layout with RML Areas 1 - 3 <br />Figure 3 – Site Layout Showing RML Area 4 <br />Figure 4 – RML #4 Restricted Area and License Boundary <br />Figure 5 – Histogram of RML #3 Soil Samples <br />Figure 6: U-nat / Ra-226 Rations for Scoping Surveys – RML#2 <br />Figure 7: Gamma Survey Results <br />Figure 8: Frequency Histograms of Radiological Scoping Surveys - OWTP <br />Figure 9: Scoping Survey Soil Sampling Locations Overlain on Gamma Survey <br />Figure 10: RESRAD Results – Residential Scenario <br />Figure 11: RESRAD Results – Commercial Scenario <br />Figure 12: RESRAD Results – Recreational Scenario <br />Figure 13: Calculation of Minimum Number of Samples for MARSSIM <br />