Laserfiche WebLink
12 3 4 5 6 <br /> A A <br /> B� <br /> at <br /> �Ia <br /> g B <br /> eh <br /> �gg[[ <br /> 'c Ws <br /> Ili C C <br /> III <br /> j;J <br /> 3 <br /> LEGEND <br /> g EXISTING EQUIPMENT AND <br /> Ea PROCESS FLOW STREAMS NOT <br /> USED FOR CONCENTRATE <br /> SHIPPING PROJECT DESIGN. <br /> REVISION <br /> PLEASE DESTROY <br /> ALL PREVIOUS COPIES <br /> 08/04/2017 <br /> REVISIONS REFERENCE DRAWINGS ISSUE RECORD ENGR RECORD D <br /> DATE BY CHK APP DRAWING NO TEE WE ISS REV TO FOR BY DATE SE We Provide SolutioSamuel EngNO DMPTIDNineering <br /> ns <br /> aaotx PLCM 11 18 2011 8450 E.Crescent Parkway,Suite 200 Phone:303.714.4840 <br /> 0 1 REVISED ENGINEERING RECORD INFORMATION 10/02/2013 PLCM GG 10-647-01 THRU 10-647-12 PROCESS FLOW DIAGRAMS 02/03/2D12 1 A CC&V STATUS oea® 44%n/ron Greenwood Village,CO 80111 Fax: 303.714.4800 <br /> H 2 REVISED BY SAMUEL ENGINEERING 07/07/2017 JRJ IG 02/13/2012 2 8 CC&V PERMIT apam ■ aAW02 CRIPPLE CREEK&VICTOR TITLE HIGH GRADE MILL <br /> a< 3 ISSUED FOR APPROVAL 03/04/2017 JRJ IA 06/11/2012 3 c cm REVIEW&COMMElr GOLD MINING COMPANY CIP AREA AND PROCESSED ORE AREA <br /> 00 4 ISSUED FOR DESIGN 10/12/2D17 ,w IA 07/23/2012 4 D CC&V HAZOP REVEYI HIGH GRADE MILL CIP AND PROCESSED ORE CIRCUIT <br /> 08/30/2012 5 E Gc&V STATUS MATERIAL BALANCE SHEET <br /> n E 02/25/2013 6 0 WENT CONSTRUC1gN FOR CC&V VICTOR, CO. <br /> 0 0 10/02/2013 7 1 CLIENT REV" nnacr 0e °B 01ron0rr DWG SIZE SCALE JOB NO DRAWING NO REV <br /> _4 v�11c1. rx wwlalz D NONE �7168 10-647-23 4 <br /> CE22z34 Continued from project(a): <br />