Laserfiche WebLink
1 2 3 4 1 5 6 <br /> N TO ROUGHER CELLS <br /> - 10-647-02 <br /> e — TO REGRIND USH <br /> TO REGRIND DISCHARGE PUMP FLUSH <br /> A TO ROUGHER CELL LAUNDER PUSH A <br /> ` — - - - — — <br /> TO ROUGHER CYCLONE FEED SUMP <br /> — — —i — — — 4 16-647-02 <br /> rrr www���1�� TO PROCESSED ORE PUMP FLUSH <br /> FROM FRESH WATER I TO PROCESSED ORE PUMP FLUSH <br /> 10-647-07 - — — <br /> — — — — — — <br /> TO CONCENTRATE THICKENER <br /> FROM PROCESSED ORE 1 10-647-06 UNDER <br /> THICKENER OVERFLOW PUMPS TO CIP UTILITIES <br /> ' FROM ONCENTRAT � - - - - - - - -1 - - - - - - - - - <br /> 10-647-04 237 <br /> TO GRAVITY TAILS PUMP FLUSH <br /> � _ _ — — — <br /> s THICKENER OVER PUMPS TO CONCENTRATE <br /> 47-11 <br /> FROM ANTISCALANT 1210-647-031A <br /> TANK TO CLEANER FLOTATION CIRCUIT — — — — — <br /> FS 10-6 <br /> A NEUTRAL PH PROCESS 10-647-02-01 TO PRIMARY CYCLONE UNDERFLOW SUMP <br /> a� <br /> WATER BOOSTER PUMP 10-647-01 <br /> 1210-647-031B 257 TO GRAVITY CONCENTRATE <br /> A NEUTRAL PH PROCESS <br /> A.A B WATER BOOSTER PUMP DISTRIBUTION TANK B <br /> TO BALL MILL SPRAY BAR <br /> TO ROD MILL <br /> 10-647-01 <br /> TO BALL MILL <br /> 1210-647-099A 10-647-01 <br /> 1110-647-002 CIP PROCESSED ORE <br /> g NEUTRAL PH PROCESS CLOTH WASH PUMP TO GRAVITY CONCENTRATOR <br /> WATER TANK 10-647-01 <br /> g 1210-647-0998 <br /> €€ CIP PROCESSED ORE TO GRAVITY CONCENTRATOR FEED SCREEN <br /> CLOTH WASH PUMP 10-647-Oi <br /> TO PRIMARY CYCLONE FE D SUMP <br /> 10-647-01 <br /> 1210-647-098A TO BALL MILL SPRAY BAR <br /> A FLOTATION PROCESSED ORE <br /> CLOTH WASH PUMP <br /> TO PRIMARY CYCLONE <br /> �P FLUSH <br /> 1210-647-0982 <br /> FLOTATION PROCESSED ORE <br /> CLOTH WASH PUMP TO UTILITY <br /> � <br /> �] TO FLOTATION FILTER FEED TANK C <br /> a — — — — — 10-647-06 <br /> BS® � rr w�Xwwl��i4� TO IP PROCESS ORE FILTERS <br /> �a� 10-647-06 <br /> Q TO FLOTATION PROCESSED ORE FILTERS <br /> 10-647-06 <br /> REVISION 0 <br /> PLEASE DESTROY <br /> ALL PREVIOUS COPIES LEGEND <br /> EXISTING EQUIPMENT AND <br /> FLOW STREAMS <br /> 08/04/201 7 ® USEDESS FOR CONCENTRATE NOT <br /> SHIPPING PROJECT DESIGN. <br /> REVISIONS REFERENCE DRAWINGS ISSUE RECORD ENGR RECORD D <br /> a No DESCRF" DATE BY CHK APP DRAWING NO TIRE DATE Iss REv TO FOR er DATE SE Samuel Engineering <br /> o1w PLCM OS 2011 B4 ProWae somaons <br /> A17 RENSED ENGINEERING RECORD INFORMATION 10/02/2013 PLCM GG 11-647-32 THRU 11-647-44 PROCESSED ORE AREA PIPING k INSTRUMENTATION DIAGRAMS /09/2011 1 A CC&V APPROVAL bFgaO m fl n/u/a1i: G—E.Greseeag.CO80111 200 Phone:303.714.4640 <br /> Greenwooe Village.CO 80111 Fax: 303.714.4800 <br /> o z REVISED BY SAMUEL ENGINEERING 07/07/2017 JRJ KA 10 647-20IHRU 10-647-23 MATERIAL BALANCE SHEETS 10/17/2011 2 8 CCRV REVIEW A COMMENT � " CRIPPLE CREEK&VICTOR TITLE <br /> ' 3 ISSUED FOR APPROVAL 08/04/2D17 JRJ KA 02/03/2012 3 C CCAV STATUS C HIGH GRADE MILL <br /> �oISSUED FOR DESIGN 10/12/2017 JP KA 02/13/2012 4 D CCdN PERMIT GOLD MINING COMPANY WATER DISTRIBUTION AREA <br /> 4 &V HIGH GRADE MILL PROCESS WATER <br /> 06/11/2012 s E CCTV REVIEW a COMMENT PROCESS FLOW DIAGRAM <br /> m E 07/23/2012 6 F OCAV HAZOP REVIEW FOR CC&V VICTOR, CO. <br /> c 02/28/2013 7 0 CL&M COLSIRI1CTgN OWG SIZE SCALE JOB NO DRAWING NO REV <br /> 10/02/2013 8 1 CL9M REVISION oua D NONE 17168 10-647-08 4 <br /> CE22x34 Continued from project(s): <br />