My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-15_PERMIT FILE - M2018030
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018030
>
2018-06-15_PERMIT FILE - M2018030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2021 11:18:32 PM
Creation date
6/18/2018 11:13:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018030
IBM Index Class Name
Permit File
Doc Date
6/15/2018
Doc Name
Application
From
Town of Granby
To
DRMS
Email Name
PSH
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
timetable. This does not exempt an Operator/Applicant from complying <br /> with the performance standards of Section 3.1. If the operation is <br /> intended to be an intermittent operation as defined in Section 34-32.5- <br /> 103(11)(b), C.R.S., the Applicant should include in this exhibit a <br /> statement that conforms to the provisions of Section 34-32.5- <br /> 103(1 1)(b), C.R.S. Such timetable should include: <br /> (i) an estimate of the periods of time which will be required for <br /> the various stages or phases of the operation; <br /> Construction of River Run Phase 1 will commence in Summer <br /> of 2018 and progress thru 2019. River Run Phase 1 includes <br /> PA 7 through 17 and parcel X. The start of Phase 2 is <br /> dependent on the success of Phase 2. Development of PAs 5, 6, <br /> 18, 19, 20,21, and 22 is dependent on market conditions. PA <br /> numbers are in reference to Exhibit D. <br /> (ii) a description of the size and location of each area to be worked <br /> during each phase; <br /> Construction will generally proceed in the Phase 1 areas and use <br /> the nearest available source of gravel and/or fill materials. Size <br /> of disturbance will vary according to adjacent fill material <br /> needs. <br /> (iii) outlining the sequence in which each stage or phase of the <br /> operation will be carried out. <br /> A portion of the area has been mined and there are existing <br /> stockpiles present that will be used for River Run Resort Phase <br /> 1 and Phase 2 as approved for development by Town of <br /> Granby. More mining may occur, as needed,based on what is <br /> needed for the River Run Resort. <br /> (Timetables need not be separate and distinct from the mining plan,but <br /> may be incorporated therein.) <br /> The Town of Granby plans to use the previously mined and <br /> stockpiled material for the Sun Communities River Run Resort <br /> development and for development of PAs 5, 6, 18—22. This <br /> development will be driven by market conditions over the next <br /> two decades. <br /> (f) A map(in Exhibit C-Pre-Mining and Mining Plan Maps(s) of Affected <br /> Lands, Subsection 6.4.3) may be used along with a narrative to present <br /> the following information: <br /> (i) nature, depth and thickness of the deposit to be mined and the <br /> thickness and type of overburden to be removed (may be <br /> marked "CONFIDENTIAL," pursuant to Paragraph 1.3(3)); <br /> and <br /> Town of Granby Mining Permit 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.