My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-15_PERMIT FILE - M2018030
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018030
>
2018-06-15_PERMIT FILE - M2018030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2021 11:18:32 PM
Creation date
6/18/2018 11:13:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018030
IBM Index Class Name
Permit File
Doc Date
6/15/2018
Doc Name
Application
From
Town of Granby
To
DRMS
Email Name
PSH
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(i) An estimate of the periods of time which will be <br /> required for the various stages or phases of <br /> reclamation; <br /> Refer to Exhibit D and Appendix D regarding the <br /> plan for the River Run Resort. Other areas will be <br /> reclaimed by Town of Granby once mining is <br /> complete. <br /> (ii) A description of the size and location of each area <br /> to be reclaimed during each phase;and <br /> Refer to Exhibit D and Appendix D regarding the <br /> plan for the River Run Resort. Other areas will be <br /> reclaimed by Town of Granby once mining is <br /> complete. <br /> (iii) An outline of the sequence in which each stage or <br /> phase of reclamation will be carried out. <br /> Reclamation will occur within two months of the <br /> completion of mining in an area and within a month <br /> of when the stockpiles have been used. Areas <br /> within the River Run Resort will be temporarily <br /> stabilized within 14 calendar days after activity has <br /> ceased,unless work is to be resumed within 45 <br /> days(Appendix G). <br /> (The schedule need not be separate and distinct from the <br /> Reclamation Plan,but may be incorporated therein.) <br /> (� A description of each of the following: <br /> (i) Final grading-specify maximum anticipated slope <br /> gradient or expected ranges thereof; <br /> Appendix C- Geotechnical Study in the Site <br /> Grading and Earthwork section discusses fill <br /> placement, site preparation, permanent cut and fill <br /> slopes, excavation considerations, utility trenches, <br /> material specifications, and compaction <br /> specifications. Permanent unretained cuts should <br /> have a maximum slope of 3:1. <br /> (ii) Seeding - specify types, mixtures, quantities, <br /> and expected time(s)of seeding and planting; <br /> Refer to Appendix G and appendix I. <br /> (iii) Fertilization - if applicable, specify types, , <br /> mixtures, quantities and time of application; <br /> Town of Granby Mining Permit 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.