Laserfiche WebLink
shall be required on all the affected land. The Reclamation Plans shall <br /> include: <br /> (a) A description of the type(s) of reclamation the <br /> Operator/Applicant proposes to achieve in the reclamation of the <br /> affected land, why each was chosen, the amount of acreage <br /> accorded to each, and a general discussion of methods of <br /> reclamation as related to the mechanics of earthmoving; <br /> Refer to Appendix D and Exhibit D for a map of the planned <br /> development in the Gravel Mine area. The reclamation of the <br /> gravel pit will include RV resort development (as approved by <br /> Town of Granby Land Use process),recreation open space, <br /> future development for Town of Granby, and native areas. <br /> The Sun Communities River Run RV park has had detailed <br /> studies and plans done of the area. While the gravel mine is <br /> permitted outside of the RV park area,the majority of the <br /> existing disturbance and commodity location is within that <br /> project boundary. The River Run RV park plans to <br /> reclaim/develop the area according to their master plan, as seen <br /> in Appendix D. The River Run RV park has developed a <br /> permanent and temporary seed mix(recommended by Grand <br /> County,MRCS). The permanent seed mix is a dry land non- <br /> irrigated grassland mix that includes smooth brome, sheep <br /> fescue,pubescent wheatgrass, and blue flax. The temporary seed <br /> mix includes an equal mixture of smooth brome and pubescent <br /> wheatgrass. Full seed mixes as well as seedbed preparation is <br /> included in the Stormwater Management Plan, Appendix G. <br /> The recreation open space is primarily in the big sagebrush <br /> shrubland and is not planned for further development. The <br /> disturbance in this space will be reclaimed using a grass and <br /> shrub seed mix as approved by the Town of Granby. Ponds will <br /> either remain as ponds or be filled and reclaimed with a <br /> grassland seed mix. Future development areas(blue and green) <br /> on Exhibit D will be reclaimed using a grassland seed mix, as <br /> this is more of an interim vegetation/soil cover till some future <br /> development occurs. <br /> The no build area has limited disturbance. The disturbance will <br /> be reclaimed using a native grassland seed mix. <br /> There are currently stockpiled materials that will be used to <br /> construct the RV Resort. Areas not included in the RV resort <br /> will be seeded with a native seed mix until such time that more <br /> development may occur. The mine has also stripped the topsoil <br /> and has stockpiled it to be used for reclamation purposes. If <br /> there is less topsoil than needed,topsoil will be imported into the <br /> area. Topsoil will be placed at 4-6 inches in areas that will be <br /> Town of Granby Mining Permit 6 <br />