My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-11_ENFORCEMENT - C1980007
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1980007
>
2018-06-11_ENFORCEMENT - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2018 7:09:41 AM
Creation date
6/13/2018 11:20:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Enforcement
Doc Date
6/11/2018
Doc Name Note
Response to Ten Day Notice and Citizen Complaint
Doc Name
Ten Day Notice Response
From
DRMS
To
OSM
Violation No.
TDN X18140182001
Email Name
JRS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 23, 2018 C-1980-007/West Elk Mine LDS <br />showed traces of coal dust on close examination, but there was no evidence of excessive dust having traveled <br />outside of the pile. <br />GENERAL MINE PLAN COMPLIANCE: <br />At the time of the inspection the longwall was in panel E7, at around cross cut 24 on the head gate. <br />Continuous miners were in the Sunset Mains South, just south of the fault, and in the E8 head gate, at around cross <br />cut 17. <br />The following permitting actions were in progress: <br />• RN -7, which was found complete on February 1, 2016. The decision due date has been extended to July <br />20, 2018. <br />• TR -145, which was found complete on March 20, 2018. The decision due date has been extended to June <br />15, 2018. <br />PR -15, which was found complete on April 5, 2018. The decision due date is August 3, 2018. <br />PROCESSING WASTE/COAL MINE WASTE PILES — Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization; Placement: <br />A moderate amount of new material had been deposited on the RPEE but had not yet been spread or <br />compacted. Surface runoff from the refuse is minimized by a clear water diversion ditch above the working <br />surface of the RPEE. The diversion ditch is in a temporary configuration right now, since the pile itself is not in its <br />final configuration. The eastern leg of the ditch had been freshly repaired following a small slide. The western leg <br />is in two sections because of geologic constraints; the upper of these sections is relatively well vegetated and <br />appears to be stable. The depth and width of the ditches were not measured during the inspection; MCC should <br />continue to monitor them to ensure that they retain sufficient capacity. <br />SUPPORT FACILITIES - Rule 4.04: <br />Mine Ventilation Borehole pads E5-8, E5-9/10, E6-8/9, E6-10 and E6-11 were inspected, with no <br />problems noted. <br />Most of the work to reclaim E5-8 had been completed in 2017, but frozen ground meant that work had to <br />be suspended. A small amount of earthwork remains and then the pad will be seeded. <br />E5-9/10 was seeded late in 2017, and the reclamation had been protected with an electric fence. Mr. <br />Peacock expects to reseed some of the E5 pads that were seeded last year, but had not yet established where that <br />would be necessary. <br />E6-8/9, -10 and -11 were all active. Equipment, such as methane pumps, had been left on the pads. The <br />pads were stable and level, topsoil piles were clearly marked and sediment controls were in place. <br />DOCUMENTS RECEIVED <br />1. APEN records and copy of renewal application (see Attachment B) <br />2. Copies of invoices for dust control products (see Attachment C) <br />3. List of certified opacity observers (see Attachment D) <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 4 <br />Page 4 of 13 <br />