Laserfiche WebLink
COLOWYO COAL COMPANY <br />SECTION 1- INTRODUCTION <br />Rills and gullies forming in reclamation areas are regraded and topsoiled if they either <br />(1) disrupt the approved postmining land use or the reestablishment of the vegetative <br />covers or (2) cause or contribute to a violation of water quality standards for receiving <br />streams. These features will be identified during the spring of each year. As part of the <br />spring inspection, regraded and topsoiled areas will be visually inspected and rills and <br />gullies identified. <br />This report provides a summary of any identified rills and gullies, all activities <br />undertaken to remediate these areas, and anticipated time frames for repair. This <br />report will be submitted annually and no later than June 15 of each year. <br />SECTION 2 — IDENTIFIED RILLS AND GULLIES <br />At the time of inspection, no areas were identified requiring immediate repair. <br />SECTION 3 — MITIGATION MEASURES <br />N/A. <br />SECTION 4—TIMELINES FOR REPAIR <br />N/k <br />Page 2 <br />