My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-12_PERMIT FILE - X201823602
DRMS
>
Day Forward
>
Permit File
>
Coal
>
X201823602
>
2018-06-12_PERMIT FILE - X201823602
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 10:20:05 AM
Creation date
6/13/2018 7:42:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201823602
IBM Index Class Name
Permit File
Doc Date
6/12/2018
Doc Name
Acceptance Of Notice of Intent to Conduct Coal Exploration
From
DRMS
To
GCC Energy, LLC
Email Name
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Backfill and Regrade Drill Pads and Mud Pits <br />BLM Exploration License, Permit Action: <br />Devils Canyon Trust Expl <br />Site: Plan <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 6/7/2018 County: La Plata <br />User: TNL <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D7R DS Series II LGP <br />Horsepower: <br />240 <br />Blade Type: <br />Straight <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/flour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />2018 Exploration <br />Drilling <br />Permit/Job#: X201823602 <br />Abbreviation: None <br />Filename: X236-002 <br />$60.88 <br />Utilization % <br />NA <br />$61.14 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />$163.87 <br />$163.87 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,469 <br />Swell factor: 1.250 <br />Loose volume: 3,086 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />0% <br />50 feet <br />800.0 LCY/hr <br />8,200 feet <br />Compacted fill or embankment 0.9 <br />Material weight: 2,650 lbs/LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.