Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 <br />Page 14 of 14 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />DURANGO <br />Total one-way travel distance: <br />20.00 miles <br />Average Travel Speed: <br />35.00 mph <br />Total Non-Roadable Mob/Demob Cost * <br />$2,337.31 <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />$25.85 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Non- <br />Roadable Roadable <br />Equipment Equipment <br />Haul Time (Hours): 0.57 0.57 <br />Return Time (Hours): 0.57 0.57 <br />Loading Time (Hours): 0.50 NA <br />Unloading Time (Hours): 0.50 NA <br />Subtotals: 2.14 1.14 <br />JOB TIME AND COST <br />Total job time: 4.29 Hours <br />Total job cost: $2,363 <br />CIRCES Cost Estimating Software <br />