Laserfiche WebLink
Weight description: Top Soil <br />Job Condition Correction Factor <br />Operator Skill: <br />0.900 <br />Material consistency: <br />1.100 <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />1.438 <br />Blade type: <br />1.000 <br />Net correction: 0.9453 <br />Adjusted unit 756.24 LCY/hr <br />production: <br />Adjusted fleet 756.24 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.217/LCY <br />Total job time: 1.92 Hours <br />Total job cost: $315 <br />Source <br />(AB.AVG.) <br />(CAT HB) <br />(GEN.) <br />(AVG.) <br />SHIFT/DA <br />(FND-RF) <br />(CAT HB) <br />(CAT HB) <br />'AT H] <br />(PAT) <br />