Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br />Colowyo is responsible for several miles of additional distribution lines on the mine that were not <br />surveyed as part of the July 2002 study. However, these lines are currently de -energized, and the <br />structures are scheduled for long-term removal as the mining operation expands and areas are reclaimed. <br />In addition, a portion of the existing 4160 volt line located along the Taylor Creek drainage traveling <br />south of the Taylor Pump Holding Pond were previously retrofitted to address the potential risk of raptor <br />electrocution. <br />As described in Section 2.05.6, all disturbed acreage, including roads, has been kept to a minimum by <br />proper planning to reduce impacts to all environmental resources, including impacts on wildlife. <br />Colowyo's objective of returning the post -mining land use to a rangeland condition capable of supporting <br />the diverse wildlife populations is being approached in several ways. As described in Section 2.04.11, <br />Colowyo initiated efforts to restore wildlife habitats during premine planning and early mining, by <br />conducting an extensive four year study to assist in determination of the best techniques for revegetating <br />disturbed areas with native species to enhance wildlife habitat. <br />A habitat improvement program, as described in Section 2.05.6, was initiated in 1975 to offset temporary <br />habitat loss during mining. As described in Section 2.05.4, the reestablishment of herbaceous species, <br />topographic relief, impoundments and limited reestablishment of a shrub component form the integral <br />elements of the reclamation plan. <br />To date these efforts have proven successful. Herds of Deer and Elk are regularly seen grazing on the <br />reclaimed areas. Rodent and small game populations have reestablished on the reclaimed areas providing <br />a readily available food source for local raptor populations and other predators. <br />4.19 Protection of Underground Mining <br />Colowyo will conduct no coal mining closer than 500 feet to any point of either an active or abandoned <br />underground mine. Underground coal mines have been operated in the past as discussed in Section 2.04.4, <br />but their locations were on the -northern side of Streeter Draw well over 500 feet from present Colowyo <br />mining. <br />The surface mining activities of Colowyo have been designed so as not to endanger any present or future <br />operations of either surface or underground mining operations. As discussed in Section 2.05.3, Colowyo <br />has engineered its mining plan to maximize recovery of coal by current economical surface mining <br />methods. <br />4.20 Subsidence Control <br />Colowyo is conducting a surface coal mining operation. Therefore, the requirements of 4.20 are not <br />applicable to the Colowyo operation. <br />4.21 Coal Exploration <br />4.21.1 Scope <br />This section sets forth performance standards and design requirements for coal exploration which <br />substantially disturbs the natural land surface. <br />Rule 4 Performance Standards 4-74 Revision Date: 1/31/18 <br />Revision No.: TR -119 <br />