My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-05_PERMIT FILE - C1981019A (7)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-06-05_PERMIT FILE - C1981019A (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2018 8:23:56 AM
Creation date
6/12/2018 7:06:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
6/5/2018
Doc Name
Volume 1 Rule 4
Section_Exhibit Name
4.02 Throuugh 4.30
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br />Vegetated areas are utilized as sediment filters. Haul Road A is under constant routine maintenance to <br />avoid damage to environmental values. <br />The construction of both haul road segments A and B was completed in 1977; however, Haul Road A will <br />be widened in 2018. The design for both haul roads had been prepared based on the anticipated volume <br />of traffic and the weight and speed of vehicles to be used. The Colowyo Coal haulage fleet used for <br />transport of coal from the primary crusher to the Gossard Loadout consists of highway trucks, and <br />transport of large mining equipment to and from the Collom Pit. <br />The haul roads are located on stable terrain to minimize erosion. As shown on the Existing Structures - <br />North Map (Map 21), the haul road A crosses Taylor Creek, and has been maintained according to the <br />requirements of 4.03.1(4). The grade and pitch requirements specified in 4.03.1(3), Design and <br />Construction, are met for both haul roads. <br />Colowyo will maintain haul roads A and B throughout the life of the mine with repairs including blading, <br />filling of potholes, and replacement of road surface as necessary. Likewise, watering for dust control will <br />be implemented as necessary. <br />Section 2.05.5 discusses the changes to be made to the main haul road, a portion of which will be left in <br />place after completion of mining to retain access into the area to compliment the post mining land use. <br />Rule 4 Performance Standards 4-3 Revision Date: 1/31/18 <br />Revision No.: TR -119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.