Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br />By employing the design criteria to minimize air blast and ground vibration Colowyo will insure that <br />flyrock, including blasting material traveling along the ground, will not be cast from the blasting vicinity, <br />more than half the distance to a nearby dwelling or other occupied structure and in no case beyond the <br />line of property owned or leased by the Company or beyond the area of regulated access required under <br />Subsection 4.08.4(5). The minimization of flyrock is also important and routinely monitored in order to <br />reduce damage to mining equipment. <br />4.08.2 Pre -Blasting Survey <br />Upon request to the Division by a resident or owner of a dwelling or structure located within one-half <br />mile of any part of the permit area, Colowyo will promptly conduct a pre -blasting survey. A copy of <br />correspondence advising our neighbors of this. opportunity is provided in Exhibit 14 - Seismograph <br />Measurements, Item 2. A report of the survey will be submitted to the Division and to the person <br />requesting the survey. The pre -blasting survey will assess the condition of the structure or dwelling and <br />document any pre -blasting damage, including any physical factors which might be reasonably affected by <br />blasting. Such a survey will determine only the surface condition of pipes, cables, transmission lines, <br />wells and other water systems; however, special attention will be given to the pre -blasting conditions of <br />wells and other water systems used for human, animal or agricultural purposes and to the quantity and <br />quality of that water. <br />A written report of any pre -blasting survey will be prepared and signed by the person conducting the <br />survey. This report will include any proposed adjustments to the blasting program which might be <br />necessary to be incorporated or should be incorporated to prevent damage. A copy of the report will be <br />provided to the person requesting the survey and to the Division. For properties owned by Colowyo, a <br />pre -blast survey will not be necessary. <br />In a report dated February 19, 1991 Colowyo initiated and reported on a Building Condition Inspection of <br />the Durham Ranch. Although the Durham ranch was located further than one-half mile from the Permit <br />Boundary at that time (approximately 4200 feet) the inspection was nevertheless completed. The Durham <br />Ranch residents were also presented with a copy of the report. On May 20, 1997 an additional copy of <br />the report was presented to the Durhams and also a copy forwarded to the Division. A copy of the May <br />20, 1997 letter can be found in Exhibit 14 - Seismograph Measurements. <br />4.08.3 Public Notice of Blasting Schedule <br />The blasting program at the Colowyo operation will involve the detonation of more than five pounds of <br />explosives or blasting agent in all blasts. Colowyo will annually publish a blasting schedule in the local <br />Craig newspaper. A typical blasting schedule published in the local newspaper is set forth in Section <br />2.05, Figure 2.05-1, Publication of Blasting Schedule. <br />Copies of the blasting schedule will be republished and redistributed every 12 months by mail to local <br />governments and public utilities and by mail or delivered to each residence within one-half mile of the <br />blasting site described in the schedule. <br />1. Destruction of damaged or deteriorating explosives or detonators; or <br />2. Disposal of misfires and/or undetonated explosives; or <br />3. Firing of charged holes as soon as practicable after cessation where electricity or stray <br />current conditions where electric detonators are used; or <br />4. Firing of charged holes when weather conditions indicate the existence of a safety hazard <br />is eminent <br />Rule 4 Performance Standards 4-27 Revision Date: 1/31/18 <br />Revision No.: TR -119 <br />