Laserfiche WebLink
COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> N,T <br /> **1876* 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> a%#A1U%400z:1VW <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> 1982-121 Mid-Continent LST %1uN 1 -12g10 <br /> File No.: M- Site Name: <br /> fop <br /> l ma�yy,, <br /> County Garfield TR# (DK 44 <br /> nj"''�' <br /> Permittee:RMR Aggregates, Inc. 1R05 <br /> X-Complied <br /> Operator(If Other than Permittee): ONE Violation! <br /> Permittee Representative: Ro b e rt Wagner acy, whe <br /> Please provide a brief description of the proposed revision: <br /> We would like to request a revision to our permit to allow for exploratory drilling of the <br /> formations within and underlying our limestone deposit within our current permit boundary. <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock not DMO $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />