Laserfiche WebLink
EXHIBIT D MINING PLAN (CONT) <br /> to control untreated runoff from leaving the site . When re- <br /> claimed the historic drainage patterns across the mine will be <br /> restored. This same slope management plan will prevent any <br /> offsite slides or other disruptions . We have not had a problem <br /> with stormwater entering the site nor have we noted any dis- <br /> charges leaving the site . No U. S . Army Corps of Engineers, 404 <br /> permit is necessary, as there are no water bodies or wetland <br /> areas on the permit area . <br /> AMENDMENT 2 - Revised Minina Timetable <br /> ACRES <br /> AREA YEARS* TOTAL MINED MINING SLOPE <br /> 100% AREA <br /> EXISTING com- 19 . 90 13 . 30 10 . 63 2 . 68 <br /> (SOUTH) plete <br /> NEW (North) 8-10 9 . 62 7 . 82 4 . 88 2 . 67 <br /> TOTALS 8-10 29 . 52 21 . 12 1 15 . 51 5 . 35 <br /> *LIFE IS BASE ON A PRODUCTION RATE 20,000 TONS PER YEAR. <br /> s <br />