Laserfiche WebLink
Revised Table 5-4 <br /> Growth Medium Storage Areas <br /> Revised Table 5-4 <br /> Growth Medium Storage Areas <br /> Designation Existing(E) or New (N)or Comments Estimated <br /> Currently Enlarged(+) Capacity(in cubic <br /> Approved(CA) yards) <br /> 1 A/1 B E + Constructed 92,000 <br /> CA N Not yet constructed 130,000 <br /> 6 E + Combined GM6 with 7 585,300 <br /> 10 and 10 a E Used in reclamation no longer N/A <br /> exists. <br /> 11 E ECOSA footprint areas go in this 500,000 <br /> pile <br /> 13 E Chicken Hawk Area 87,050 <br /> 14 E To be used for Main Cresson 25,000 <br /> reclamation <br /> 19* E South of Carlton Gate 519,161 <br /> 27 E Behind HG Mill 415,404 <br /> 30 E Likely to be relocated or used in 61,100 <br /> concurrent reclamation <br /> 32-33 E Crusher Area 29,000 <br /> 34 E Near Squaw VLF 599,859 <br /> 37 E Toe of Ruby Road 49,450 <br /> 38 E Grassy Valley 44,500 <br /> 39 E To be used for Schist Island 205,440 <br /> reclamation <br /> CT E Located at Carlton Tunnel 1,784 <br /> Estimated Total Existing and Proposed 3,345,048 <br />