My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-07_REVISION - M1977376
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977376
>
2018-06-07_REVISION - M1977376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2021 4:53:49 AM
Creation date
6/7/2018 4:01:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977376
IBM Index Class Name
REVISION
Doc Date
6/7/2018
Doc Name
Request for Technical Revision
From
Continental Materials
To
DRMS
Email Name
TC1
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M-1977-376 - TR03 <br /> om <br /> Cplied! RECEIVED <br /> TWO prior Violations! SUN � <br /> tc1, mac / <br /> 2018 <br /> COLOR-A,DO DIN ll�ivl. .,� a NING AND S.X j'MJ1NN <br /> 1313 Sherman Street.Room 21j.Denver.Colorado 80203 ph(30)866-3567 OF��� <br /> �876 MININGAN©SA Ery��N <br /> REQUEST FOR TECHNICAL REVISIO\(TR)COVER SHEET <br /> File No.:M- 1977-376 Site Name:Canyon Dolomite Quarry <br /> County Fremont TR# (MIS Use only) <br /> Penmttee:Continental Materials Corporation <br /> Operator(If Other than Pernuttee):Transit MIX Concrete Co. <br /> Pennittee Representative:Mr. Brandon Heser, Transit Mix Concrete Co.(719) 313-0316 <br /> Please provide a brief description of the proposed revision: Re-vise the approved seed mix <br /> for the Fines Disposal Area and submit a proposed grading plan for this area. <br /> As defined by the Minerals Rules,a Technical Revision(TR)is:"a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a pernut amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days.If the Division requires additional information to approve a <br /> TR,you%,ill be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time,in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR;however,it is tip to the perurittee to provide <br /> sufficient information to the Division to approve the TR request,including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Penuit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tvne Required TR Fee Submitted(mark only one) <br /> 110c. 111. 1121 construction ❑ <br /> materials_and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(l,2 or 3) $1006 ❑ <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.