Laserfiche WebLink
2. Reclamation Timetable <br /> Reclamation will take place concurrent with mining with an additional estimated 4 months of <br /> reclamation commencing after mining is completed. Mining is projected to be completed by <br /> 2030. Therefore, final reclamation and bond release is expected to be completed by 2031 or <br /> within 14 years. Exhibit L: Reclamation Costs describes the worst case bond scenario. <br /> 3. Revegetation Plan <br /> For each area of reclamation soil will be disked to loosen the soil. Due to the mild grade, seed <br /> can be drilled in both regions; broadcast seeding will be utilized where reclaimed perimeter <br /> slopes do not allow drilling. Seed mixes listed below will be used to revegetate the site with <br /> rangeland mix on the slopes and irrigated pasture on the flats. Certified weed free mulch will be <br /> crimped into the surface at 2000 lbs. per acre. Fertilizer may be added as determined by a soil <br /> test at the time of seeding. Heavy furrows will be left in the tilled topsoil to provide moisture <br /> concentration and shade areas in order to promote better conditions for successful vegetation <br /> establishment. Seeding will take place during the fall following retopsoiling of slopes. Slopes <br /> will be regraded, backfilled, and retopsoiled as soon as they are able to be reclaimed. <br /> Fetcher Vale Pit <br /> May 2018 E-4 <br />