My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-07_PERMIT FILE - M2002119
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2002119
>
2018-06-07_PERMIT FILE - M2002119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:35:26 PM
Creation date
6/7/2018 1:02:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002119
IBM Index Class Name
Permit File
Doc Date
6/7/2018
Doc Name
Addendum To Application
From
Elam Construction
To
DRMS
Type & Sequence
AM1
Email Name
SJM
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I D-6 Bulldozer <br /> 14000 gallon water truck <br /> I CAT 349 Excavator <br /> 2 off-highway road haul trucks (number will depend upon production needs) <br /> 15 and 24 ton on-road haul trucks (number will depend upon production needs) <br /> All fuel tanks will have secondary containment. Some are double walled, others will be located <br /> within bermed or lined areas that have over 110% of the volume of the largest stored tank. Fuel <br /> tanks can be found in the center of the site on the pit floor and in the Staging Area; See Map C-1. <br /> A portable asphalt plant may be erected on the site periodically. Material crushed and stockpiled <br /> on site may be used for asphalt production. Maximum asphalt production will not exceed 2,000 <br /> tons per day. Asphalt production may occur only during the warm season months of April <br /> through October. The portable plant will not be at the site more than 6 weeks per year and cannot <br /> be on site more than 30 days at a time without special Routt County approval. Components <br /> associated with the portable asphalt plant include: <br /> - Liquid asphalt storage <br /> - Aggregate feed bins <br /> - Mixer <br /> - Conveyors <br /> - Lime silo <br /> - Truck loading equipment <br /> - Power supply and distribution <br /> No night mining activity is scheduled for the operation; however portable lighting may be used <br /> within the pit from time to time. The portable lights will only be used at the bottom of the pit for <br /> the purpose of after hour equipment maintenance and crushing activities within the permitted <br /> hours in the winter months while the days are shorter. Portable toilets will be used for <br /> employees. All mining structures on site are shown on Map C-1. The portable mining <br /> equipment such as loaders, dozers, trucks and excavators will be serviced on an as-needed basis <br /> onsite. Upon reclamation, all portable equipment will be removed from the site. <br /> Fetcher Vale Pit <br /> May 2018 D-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.