My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-18_PERMIT FILE - C1981019 (9)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-05-18_PERMIT FILE - C1981019 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2018 8:29:37 AM
Creation date
6/7/2018 8:07:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
5/18/2018
Doc Name
Pond As-Built
Section_Exhibit Name
Volume 18 Exhibit 7 Item 26 Part E
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part E Section 25 Pond As-Built <br /> As required by Rule 4.05.9 (14), the following report is provided to document construction <br /> information upon completion of construction. <br /> Design information for the pond is presented in Volume 18, Exhibit 7, Item 23, Part C. The as- <br /> built drawing for the Section 25 Pond is provided in Figure 7-26E-1 and includes plan view, <br /> cross-sections, and spillway details. The final configuration of the pond was adjusted for the <br /> variable topsoil depths encountered during topsoil removal, but the as-built elevations for the <br /> emergency and principal spillways remained consistent with the design. <br /> The emergency spillway consists of a 5-foot deep rip rap channel with a 20-foot bottom width <br /> and side slopes near 3.OH:1V. The spillway as-built condition was adjusted from the design in <br /> the field to limit overall disturbance with construction of a pond occurring within a valley, but <br /> the intent of the design engineer was carried into the final design and the as-built of the <br /> emergency spillway. <br /> The Section 25 Pond was constructed from mid-August until the end of October of 2017, and <br /> was regularly inspected throughout construction by a qualified registered professional engineer. <br /> The embankment was constructed with fill material that was free of any unacceptable fill <br /> material as outlined in the Exhibit 7, Item 23, Part K. Compaction, optimum moisture, and <br /> maximum dry density testing was performed in the field during construction of the embankment <br /> and the results of this testing are presented Attachment Exh. 7-26E-1. Final field density tests <br /> indicated a 95% standard or greater compaction was achieved. <br /> The final embankment has been broadcast seeded with the seed mixture outlined in Volume 15, <br /> Section 4.05.6 Sedimentation Ponds. <br /> Exhibit 7 Item 26 Page Exh. 7-23E-1 Revision Date: 6/13/17 <br /> Revision No.: TR-112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.