Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />FIELD REPORT <br />Project: Coilom Haul Road & Project No.: 17-10686 <br />Date: <br />5/15/17 <br />Pipeline <br />Time: <br />11 5 <br />Location: Rio Blanco County Report No.: 14 <br />Mileage: <br />1 Trip <br />Client: Wollam Construcion <br />Engr. /Tech: <br />RE <br />Work Performed: <br />As requested, we visited the project site on today's date and conducted compaction test No 's 35 through 39 on <br />the material being placed for the Wilson Storage Pond embankment fill <br />The excavation contractor Precision Excavating placed moisture conditioned and compacted on-site material for <br />the embanKment fill <br />Remarks: <br />The materials tested generally met the project soecifications for compaction <br />Please refer to the attached sheet for results of today's testing <br />Verbal Discussions: <br />Tommy Sirk of Precision Excavating was notified of today's test results <br />