Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />FIELD REPORT <br />Project: Collom Haul Road & Project No.: 17-10686 Date: 5/11/17 <br />Pipeline Time: 10 5 <br />Location: Rio Blanco County Report No.: 12 Mileage: 1 Trip <br />Client: Wollam Construcion Engr, /Tech: RE <br />Work Performed: <br />As requested we visited the project site on today's date and conducted compaction test No 's 26 through 30 on <br />the material being placed for the Wilson Storage Pond embankment fill <br />The excavation contractor Precision Excavating, placed, moisture conditioned and compacted on-site material for <br />the embankment fill Prior to placement of the crew scarified, moisture conditioned, and re -compacted the <br />subgrade <br />In addition we obtained a sample of the material being placed and returned to our laboratory for standard Proctor <br />and classification testing This will be designated as Proctor No 8 (8P) for this orotect <br />Remarks: <br />The materials tested generally met the project specifications for compaction <br />Please refer to the attached sheet for results of today's testing <br />Verbal Discussions: <br />Tommy Sirk of Precision Excavating was notified of today's test results <br />