My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-06_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2018-06-06_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2018 12:11:37 PM
Creation date
6/7/2018 6:19:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
6/6/2018
Doc Name
Cost Estimate
From
DRMS
To
Twentymile Coal Company
Type & Sequence
TR90
Email Name
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br /> <br />Task description: Backfill and Grade 4 WMD Borehole Pads and rds (14 -17L) <br />Site: Foidel Creek Mine Permit Action: TR90 Permit/Job#: C1982056 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado Abbreviation: None <br />Date: 6/1/2018 County: Routt Filename: 004 <br />User: TNL <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D10T - 10SU <br />Horsepower: 574 <br />Blade Type: Semi-Universal <br />Attachment: 3-shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $122.17 NA <br />Operating Cost/Hour: $111.29 100 <br />Ripper own. <br />Cost/Hour: $14.40 NA <br />Ripper op. Cost/Hour: $2.06 25 <br />Operator Cost/Hour: $41.85 NA <br />Total unit Cost/Hour: $291.77 <br />Total Fleet Cost/Hour: $291.77 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 12,100 <br />Swell factor: 1.125 <br />Loose volume: 13,613 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell <br />factor: <br />Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 95 feet <br />Unadjusted hourly <br />production: <br />1,796.2 LCY/hr <br /> <br />Materials consistency <br />description: <br />Compacted fill or embankment 0.9 <br /> <br />Average push <br />gradient: <br />0 % <br />Average site altitude: 6,925 feet <br /> <br />Material weight: 2,650 lbs/LCY <br /> <br />Weight description: Decomposed rock - 25% Rock, 75% Earth
The URL can be used to link to this page
Your browser does not support the video tag.