Laserfiche WebLink
points shown below are approximate locations taken within GF01 however, due to the relatively small and flat <br />area of GF01, the two points should accurately represent the elevation of the approximate GPS locations. <br /> <br /> <br />Geotechnical drill holes WR-1 through WR-4. WR-1 through WR-4 were dill holes that were drilled under a <br />geotechnical drilling program to assess the ground conditions for the expansion of the pumping station and new <br />raw water pipeline. Drill holes WR-1 and WR-2 have had the Wilson Reservoir Pump house constructed over <br />them. Drill hole WR-3 and WR-4 were drilled on both sides of State Highway 13. No visible drill holes were able <br />to be located due to the nature of being backfilled and reclaimed. No issues were observed. <br /> <br /> <br />Reclamation Parcels C01 and CO2. C01 and C02 are a 0.3 and 0.2 acre parcels that were access points for a <br />geotechnical drilling program and the small areas were reclaimed in 2016. Each road was inspected visually and <br />no issues were noted. The areas blended into the adjacent undisturbed native area.