My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-01_REVISION - C1980007 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2018-06-01_REVISION - C1980007 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2018 10:21:06 AM
Creation date
6/6/2018 9:52:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
6/1/2018
Doc Name
Comment Forwarded To Applicant
From
Shannon Hughes, Wild Earth Guardians
To
DRMS
Type & Sequence
PR15
Email Name
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br />ExecutiveSummary...................................................................................................................................1 <br />Introduction and Previous Studies and Findings from Work Conducted at West Elk Mine .....................2 <br />Introduction..........................................................................................................................................2 <br />PriorEPA Work......................................................................................................................................2 <br />Techno-Economic Study Commissioned by MCC.................................................................................2 <br />MWCC Methane Emissions Data Reported under Subpart FF..............................................................3 <br />Considerations for Capture and Use of CMM at the West Elk Mine........................................................9 <br />CMMCapture......................................................................................................................................10 <br />Abatement of drained CMM from GVBs.................................................................................................11 <br />Economic Evaluation of CMM Abatement..............................................................................................12 <br />Discounted Cash Flow Analysis...........................................................................................................12 <br />Flaring as an methane abatement option at West Elk.......................................................................13 <br />Results of CMM Destruction Economic Analysis................................................................................16 <br />Summaryof Findings: ............................................................................................................................. 18 <br />Recommendations for Improving Economic Performance of a Flaring Project.................................19 <br />List of Tables <br />Table 1: Abutec Flare Process Data.............................................................................................................13 <br />Table 2: Model inputs: Flaring Scenario......................................................................................................14 <br />Table 3: Economic Indicators - 10 Year Flaring Project...............................................................................19 <br />Table 4: Gas Gathering System Cost Comparison Table.............................................................................20 <br />List of Figures <br />Figure 1: Graphic Representation of Publicly Available Methane Liberation Data for West Elk Mine ........4 <br />Figure 2: Probability Distribution for Methane Concentration in ESM Shaft...............................................6 <br />Figure 3: Probability Distribution of Total Ventilation Flow for ESM Shaft..................................................7 <br />Figure 4: Probability Distribution of Number of GVBs Operating each Week..............................................8 <br />Figure 5: Probability Distribution of Weekly Production for all Operating GVBs.........................................8 <br />Figure 6: Probability Distribution of Methane Concentration in Gob Gas...................................................9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.