Laserfiche WebLink
Exhibit 2 WEST ELK MINE GOB GAS GATHERING SYSTEM COSTS <br />WEST ELK MINE <br />"E" Seam Gathering <br />Description <br />MATERIAL <br />Quantity <br />Units <br />Unit Cost <br />Total cost <br />Category Totals <br />Comments <br />8" <br />10" <br />10" SDR 11 <br />46,072 <br />ft <br />16 <br />737,152 <br />Pricing has increase 4 fold on Poly <br />pipe <br />10" SDR 11- Winter temp <br />6,000 <br />16 <br />96,000 <br />6" SDR 11 <br />188,218 <br />5 <br />941,090 <br />Valves <br />1 Lot <br />50,000 <br />50,000 <br />these valves are$200-500 each <br />12" plg traps <br />1 Lot <br />60,000 <br />60,000 <br />Need more explanation; so left it <br />alone <br />991,090 <br />893,152 <br />Total Materials <br />1,884,242 <br />INSTALLATION <br />10" SDR 11 (Per Petty Quote) <br />46072 <br />ft <br />23 <br />1,059,656 <br />10" Poly -Temp top of ground <br />6000 <br />ft <br />20 <br />120,000 <br />Roustabout to set and hookup in <br />one day <br />6" SDR 11 (per Petty quote) <br />188,218 <br />10 <br />1,882,180 <br />This is low pressure only for <br />collapse resistance <br />Pig Traps <br />3 <br />each <br />35,000 <br />105,000 <br />1,882,180 <br />1,284,656 <br />Total Installation <br />3,166,836 <br />PROJECT MANAGEMENT <br />Engineering <br />Coordination & Inspection <br />120 <br />1,000 <br />120,000 <br />Contingenecy 10% <br />517,108 <br />% tangible <br />33.1% <br />Total Project Management <br />6371108 <br />% intangible <br />66.9% <br />TOTAL GATHERING COST <br />$ 5,688,185.80 <br />Total costs for 6" Pipe <br />Cost per foot <br />Total costs for 10" Pipe <br />Cost per foot <br />3,191,824 <br />16.96 <br />2,496,362 <br />47.94 <br />