Laserfiche WebLink
J <br /> CR- EK <br /> 10450 f 159th Ct. Phone. 303-637-0344 <br /> Brighton, Co. 80602 Fax:303-637-0423 <br /> www.toddcreekvillage otg <br /> Q. The Division assumes no explosives will be used during the <br /> operation. Please confirm. If explosives will be used, please address <br /> the requirements of Rule 6.3.3(p) and 6.5(4). <br /> A. No explosives will be used in this project. <br /> Rule 6.3.4 — Exhibit E — Map <br /> Q. Please revise the Exhibit E1 map to identify the owner of the substance to be <br /> mined and the owners of record of the permanent or man-made structures within 200 <br /> feet of the affected land. <br /> A. The owner of the land and the soil to be removed is Todd Creek Village <br /> Metropolitan District. <br /> Q. Please revise the Exhibit E1 map to indicate the direction that construction material <br /> extraction will proceed. <br /> A. The excavation is planned to start at the southeast and proceed northwest until the <br /> project is complete. <br /> Rule 6.3.6 — Exhibit F— List of Other Permit and Licenses Required <br /> Q. Please indicate if a well permit, substitute water supply plan and/or an effluent <br /> discharge permit will be required. <br /> A. We do not anticipate needing a well permit, substitute water supply plan and/or an <br /> effluent discharge permit for this project. if any of these become necessary due to <br /> unforeseeable circumstances, we are prepared to immediately obtain any of the needed <br /> permits or plans for this project. There are a few relatively minor permits needed from <br /> Adams County(Grading & Drainage permit and a No export and Not for Sale Mining <br /> permit). The permit area excavation will not start until all permits are obtained. <br /> Rule 6.3.12 — Exhibit L— Permanent Man-Made Structures <br /> Q. This exhibit included engineering evaluations for structures within 200 feet of the <br /> affected land owned by KP Kaufman Company, Inc. and ERN Limited Partnership Et Al. <br /> These evaluations assert that the structures will be stable given the 3H:1V constructed <br /> slopes of the reservoir. Please provide documentation such as modeling to support this <br /> assertion. Enclosed is a Mined Land Reclamation Board approved policy regarding <br /> accepted factors of safety for slope stability/geotechnical analyses associated with <br /> mining operations. Or, if the entities described above have signed the structure damage <br /> 31 P .I- e <br />