My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-04_PERMIT FILE - M2017044
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017044
>
2018-06-04_PERMIT FILE - M2017044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2021 9:05:54 PM
Creation date
6/4/2018 4:31:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017044
IBM Index Class Name
Permit File
Doc Date
6/4/2018
Doc Name
Application
From
McFarland Enterprise, Inc.
To
DRMS
Email Name
LJW
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D-Reclamation Plan <br /> Rule 6.3.4 (Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E - Map. <br /> 1) Primary future(Post-mining) land use (check one): <br /> Cropland (CR) Pastureland(PL) General Agriculture (GA) <br /> Rangeland (RL) Forestry (FR) Wildlife Habitat(WL) <br /> Residential (RS) Recreation (RC) Industrial/Commercial (IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> Mine Portal will be collapsed, little to no backfill is expected. Back slope will be re-graded to work <br /> with existing contours or at a 2H:1V. Available top soil will distributed across disturbed area and <br /> re-seedad_ Fxisting road will tarrifirps and rP-spPdPd to the privatp nraparty line of MS 160W- Hnbn <br /> 3) What will the final grade of the reclaimed slopes (Horizontal:Vertical): 2 H: 1 V <br /> (Note: If the Applicant proposes slopes steeper than 3H: 1 V (example 1 H:1 V, 2H: 1 V, etc.), please <br /> include a justification: <br /> a. Please provide a general description of the backfilling and grading: <br /> Little to no backfill is expected, grading work to match with existing contours <br /> 4) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches _F-1 6-8 inches <br /> 8-10 inches F-1 10-12 inches <br /> Other: <br /> F-1_ N/A, explain:Teat;is available will be di5tributed ac-ress d;stuFbed <br />
The URL can be used to link to this page
Your browser does not support the video tag.