My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-04_PERMIT FILE - M2017044
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017044
>
2018-06-04_PERMIT FILE - M2017044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2021 9:05:54 PM
Creation date
6/4/2018 4:31:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017044
IBM Index Class Name
Permit File
Doc Date
6/4/2018
Doc Name
Application
From
McFarland Enterprise, Inc.
To
DRMS
Email Name
LJW
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C -Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E—Map. <br /> 1) Estimated dates of commencement: 7/15/2018 and completion: 9/30/2028 <br /> 2) How many years is the mine anticipated to be operational: 10 years <br /> 3) Will mining activities occur all-yearlong or just seasonally when weather permits (check one): <br /> (_[]) all-yearlong or(ED seasonally,explain: Activities preformed while weather permits <br /> 4) How many aces of the mine site will be disturbed at any given time: 0.5 acres <br /> 5) Depth of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches =6-8 inches <br /> 8-10 inches _1:1_10-12 inches <br /> Other: None <br /> N/A, explain: <br /> 6) Will you need to move any overburden (check one): (=) Yes or(]Z-)No <br /> a. If yes,approximately how thick is the overburden? feet <br /> 7) How will the mine be accessed: (_� existing roads (-a) new roads will be created <br /> Please describe the existing roads: <br /> Existing road through private property <br /> a. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements: <br /> 8) Will water be needed during the mining operation (check one): (-[:]j Yes or No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> 9) Will any water diversions or impoundments be constructed (check one): Yes or( ✓�No <br /> a. If yes, please describe the water diversions or impoundments: <br /> 10)Will any chemicals be used during the mining process (check one): (_a)Yes or (_a)No <br /> a. If yes,please describe the chemical types and quantities to be utilized, chemical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should include tank capacities and operating solution volumes: <br />
The URL can be used to link to this page
Your browser does not support the video tag.