Laserfiche WebLink
RN07 <br />Page 12 <br />5/30/18 <br /> <br />disturbance, soil recovery estimates are typically based on the soils mapping, unit descriptions, and our previous (if <br />any) field experience in the general vicinity of the proposed disturbance area. Th e additional text description <br />referenced in the previous response includes information on determination of soil recovery depths. <br /> <br />Resolved <br /> <br />Rule: 2.05.3 (4)(a)-(d) <br />37. In Section 2.05-76.1 through 2.05-84, there seems to be duplicate information and outdated pages. Please <br />address the following: <br />a. Please clarify Exhibit 8C (1). Was this structure ever built? <br />b. In the narrative (Section 2.05-76.1 through 2.05-84) for the following ponds, please insert the Exhibit <br />number and information as to the design precipitation event (for example: 10yr/24 hr or 25yr/24hr): <br />i. Pond B <br />ii. Pond C <br />iii. Pond D <br />iv. Pond E <br />v. Pond F <br />vi. Pond G <br />vii. Pond T <br />viii. FCB Treatment Facility <br /> <br />Response: - The treatment ponds for the EMD Dewatering Facility (10-Right) referenced in the text, with designs <br />provided in Exhibit 8C(1), have not been built. There is, however, still the potential that they could be needed in <br />the future, so the related text discussion and design information should be retained in the PAP. <br /> <br />The referenced text discussion for sediment control structures has been revised to reference the applicable exhibit(s) <br />for each structure and the design basis. Copies of the revised text pages accompany these responses for replacement <br />in the PAP. <br /> <br />Resolved <br /> <br />38. Section 2.05-76-1 regarding Pond D states that the spillway was relocated. Please either provide the exhibit <br />number for updated as built designs for the relocated spillway, or provide a set of updated as-builts reflecting <br />the new spillway location. <br /> <br />Response: - The referenced Pond D spillway modifications were approved under TR07-59, with designs as shown <br />in Exhibit 8H2. The referenced permit text has been revised to reference this exhibit and copies of the revised text <br />page accompany these responses for replacement in the PAP. <br /> <br />Resolved <br /> <br />39. Pond F Exhibit 8I includes a list of As-Built Specifications. Exhibit 8P in the Permit entitled: Plate 1, Sediment <br />Ponds, Energy Mines No.1 and No. 2 and Eckman Park includes a table entitled Pond Schedule. The Pond <br />Schedule table and Exhibit 8I As Built Specification values differ from each other. Please address the following: <br />a. Please check Exhibit 8I, as built specifications for Pond F against the Pond Schedule in Exhibit 8I(P) <br />and submit a new Pond Schedule table addressing the following values: <br />i. Sediment Storage Volume